Are we ready for TRR?

GX-1, a fictitious 150 kg-class optical Earth-observation smallsat in low Earth orbit, is preparing for its TRR before system-level thermal-vacuum (TVAC) testing. Choose a gate and a subsystem, open an issue, and follow the evidence.
Not a flight-safety or certification determination. All data is fictitious and invented for this demonstration. It shows how AEAIP is designed to present readiness; it is not AEAIP software, and the readiness logic is a simplified teaching model.

Interactive readiness explorer

1 · Choose a review gate
Loading 3D view…
2 · Choose a subsystem

TRR · Test Readiness Review

Current gate

Are we ready for TRR?

Illustrative readiness recommendation

GO WITH CONDITIONS

8 conditions, no blockers.

Requirements verified (to date)
362 / 496
Evidence gaps
Open NCRs
Configuration mismatches
Pending tests
Cybersecurity findings
Critical anomalies1 major anomaly open
  • StructureREADY
  • EPSCONDITIONAL
  • ADCSCONDITIONAL
  • ThermalREADY
  • AvionicsCONDITIONAL
  • CommsREADY
  • PayloadREADY
  • Flight SWCONDITIONAL
  • CyberCONDITIONAL

Illustrative readiness recommendation based on sample data. Not a flight-safety or certification determination. The review board decides.

3 · Open items affecting TRR

8 of 8 shown

4 · Evidence trace

ANM-0219 · Anomaly · Flight SW

FSW-247 failed in hardware-in-the-loop test

Safe-mode transition took 2.7 s against a 2 s requirement; corrective action implemented, retest pending.

  1. Subsystem — Complete

    Flight Software

  2. Requirement FSW-247 — Complete

    Transition from NOMINAL to SAFE mode within 2 s of a watchdog timeout, preserving the last 60 s of housekeeping telemetry.

  3. Verification method — Complete

    Test — hardware-in-the-loop (HIL)

  4. HIL test — Complete

    HIL campaign C3 on the flat-sat, fault-injection case FI-12

  5. Test procedure — Complete

    TP-FSW-118 Rev C · approved

  6. Applicable configuration — Complete

    FSW build 4.2.0 · OBC engineering model S/N 002 (Rev D) · HIL simulator v3.1

  7. Test result — Failed

    FAIL — transition 2.7 s; telemetry buffer truncated to 41 s

  8. Anomaly — Needs attention

    ANM-0219 (major) — telemetry flush blocked the mode-manager task

  9. Corrective action — Complete

    CA-0219 — flush moved to a low-priority task; FSW build 4.2.1

  10. Retest status — Open

    HIL retest C3-R on build 4.2.1 · scheduled, not yet run

  11. Verification closure — Open

    Open — awaiting retest evidence

  12. Authorized review — Open

    Not started — closure needs the flight software lead and the chief engineer

Condition for TRR: HIL retest on build 4.2.1 passes before the TVAC functional sequence starts.

  • Complete
  • Failed
  • Needs attention
  • Open

5 · Evidence validity: when verified evidence becomes stale

Requirement SAT-EPS-014 was verified in June. Step through what happens when its configuration changes.

Step 1 of 5

June: requirement verified

Evidence validity: Current

TR-EPS-114 passes at 4.102 V per cell. The evidence and the baseline under review are the same configuration.

Closed by the EPS lead; approved at the June verification board.

Evidence configuration compared with the baseline under review
ItemEvidence onUnder review
Requirement SAT-EPS-014Rev 2MatchRev 2
Battery management firmwareBMS FW 2.3.0MatchBMS FW 2.3.0
EPS boardPCB Rev BMatchPCB Rev B
EPS–OBC interfaceICD Rev CMatchICD Rev C
Test procedureTP-EPS-022 Rev AMatchTP-EPS-022 Rev A

How the demo decides

Transparent readiness rules

Every open item records the first gate it affects and whether it is a condition or a blocker there. Many conditions become blockers at a later gate: an anomaly that may be open while a test starts must be closed before acceptance.

  • A subsystem is NOT READY if any blocking item affects it, CONDITIONAL if only conditions do, otherwise READY.
  • The overall recommendation is NOT READY if any subsystem is NOT READY, GO WITH CONDITIONS if any is CONDITIONAL, otherwise GO.
  • Every count on the panel is the number of listed items of that type, so every number can be opened.
  • Gates already held show their recorded decision; later gates show a forecast from today's evidence.

Real programmes define their own criteria through Configurable Assurance Gates, and the decision is always the review board's.

Text version

GX-1 sample data

The complete demo dataset as text: the same content the interactive view presents.

TRR readiness: GO WITH CONDITIONS (illustrative)

Subsystem readiness for TRR
SubsystemVerifiedTRR
Structure & Mechanisms41/48READY
Electrical Power (EPS)49/62CONDITIONAL
Attitude Determination & Control (ADCS)38/54CONDITIONAL
Thermal Control24/36READY
Avionics & On-board Computer45/58CONDITIONAL
Communications35/44READY
Payload (optical imager)52/70READY
Flight Software63/96CONDITIONAL
Cybersecurity15/28CONDITIONAL

Requirements verified 362 of 496; evidence gaps 1; open NCRs 1; configuration mismatches 2; pending tests 2; cybersecurity findings 1; critical anomalies 0.

Gates already held

  • MCR — GO. Mission need and optical EO concept agreed.
  • SRR — GO. System requirements baselined; 14 TBDs assigned owners.
  • SDR — GO. Architecture and allocation accepted; power margin action closed.
  • PDR — GO. Six actions raised; all closed.
  • CDR — GO WITH CONDITIONS. Waiver WVR-007 (radiator emissivity) approved and carried forward.
  • SIR — GO. Two NCRs on incoming harnesses closed before integration.

Open items and their evidence traces

  • ANM-0219 · Anomaly · from TRR · blocking from SARFSW-247 failed in hardware-in-the-loop test

    Safe-mode transition took 2.7 s against a 2 s requirement; corrective action implemented, retest pending.

    1. Subsystem: Flight Software
    2. Requirement FSW-247: Transition from NOMINAL to SAFE mode within 2 s of a watchdog timeout, preserving the last 60 s of housekeeping telemetry.
    3. Verification method: Test — hardware-in-the-loop (HIL)
    4. HIL test: HIL campaign C3 on the flat-sat, fault-injection case FI-12
    5. Test procedure: TP-FSW-118 Rev C · approved
    6. Applicable configuration: FSW build 4.2.0 · OBC engineering model S/N 002 (Rev D) · HIL simulator v3.1
    7. Test result: FAIL — transition 2.7 s; telemetry buffer truncated to 41 s
    8. Anomaly: ANM-0219 (major) — telemetry flush blocked the mode-manager task
    9. Corrective action: CA-0219 — flush moved to a low-priority task; FSW build 4.2.1
    10. Retest status: HIL retest C3-R on build 4.2.1 · scheduled, not yet run
    11. Verification closure: Open — awaiting retest evidence
    12. Authorized review: Not started — closure needs the flight software lead and the chief engineer

    Condition: HIL retest on build 4.2.1 passes before the TVAC functional sequence starts.

  • TST-FSW-031 · Pending test · from TRR · blocking from SARHIL retest of FSW-247 on build 4.2.1

    Retest is scheduled before the TVAC functional sequence; its result closes ANM-0219.

    1. Requirement: FSW-247 — safe-mode transition within 2 s
    2. Driver: Corrective action CA-0219 (anomaly ANM-0219)
    3. Test procedure: TP-FSW-118 Rev C · unchanged, still applicable
    4. Configuration to test: FSW build 4.2.1 on OBC engineering model S/N 002
    5. Regression scope: Mode-manager and telemetry regression set (112 cases)
    6. Status: Scheduled · not yet run

    Condition: Run before the first TVAC functional test; results reviewed by the flight software lead.

  • SAT-EPS-014 · Configuration mismatch · from TRR · blocking from SARBattery charge evidence produced on an earlier configuration

    Verified in June on BMS firmware 2.3.0 and PCB Rev B; both have since changed. Evidence validity: At Risk.

    1. Subsystem: Electrical Power (EPS)
    2. Requirement SAT-EPS-014 (Rev 3): Terminate battery charging at 4.10 V ±0.015 V per cell between 0 °C and 40 °C
    3. Verification method: Test — EPS functional test across temperature
    4. Evidence: TR-EPS-114 (June) · PASS at 4.102 V per cell
    5. Evidence configuration: Requirement Rev 2 · BMS FW 2.3.0 · PCB Rev B · ICD Rev C · TP-EPS-022 Rev A
    6. Changes since: Requirement Rev 3 · BMS FW 2.4.0 · PCB Rev C · ICD Rev D · TP-EPS-022 Rev B
    7. Evidence validity: At Risk — configuration no longer matches the baseline under review
    8. Engineering disposition: Reverification Required (delta analysis DA-EPS-009, EPS lead)
    9. Verification closure: Reopened

    Condition: Requirement reopened; evidence is not counted as verified until the delta test passes.

  • TST-EPS-022 · Pending test · from TRR · blocking from SARDelta charge-termination test on BMS FW 2.4.0

    Reverification of SAT-EPS-014, planned in the TVAC functional sequence.

    1. Requirement: SAT-EPS-014 Rev 3
    2. Driver: Reverification required after BMS FW 2.4.0 and PCB Rev C
    3. Test procedure: TP-EPS-022 Rev B · approved
    4. Configuration to test: Flight battery assembly with BMS FW 2.4.0 · PCB Rev C
    5. Status: Planned in TVAC functional sequence

    Condition: Included in the TVAC functional sequence and reported before the hot plateau ends.

  • CFG-ADCS-007 · Configuration mismatch · from TRR · blocking from SARStar tracker 2 replaced; test article list not updated

    Unit S/N 0031 swapped for S/N 0034 after a connector issue; the as-run configuration list still shows S/N 0031.

    1. Subsystem: ADCS
    2. Configuration item: Star tracker 2 · S/N 0031 → S/N 0034 (same part number and revision)
    3. Affected evidence: Alignment measurement AL-ADCS-004 recorded on S/N 0031
    4. Similarity rationale: Draft — same lot, acceptance data available for S/N 0034
    5. Test article configuration list: Update to Rev F pending
    6. Authorized review: Configuration manager and ADCS lead

    Condition: Test article configuration list updated to Rev F before the test starts.

  • NCR-0142 · NCR · from TRR · blocking from SARHarness connector J12 backshell torque out of tolerance

    Dispositioned use-as-is by engineering; Material Review Board signature pending.

    1. Subsystem: Avionics & On-board Computer
    2. Requirement: AVI-HRN-033 — connector backshell torque per harness drawing
    3. Inspection: Torque audit during integration · 0.9 N·m measured vs 1.1 N·m minimum
    4. NCR: NCR-0142 raised
    5. Disposition: Use-as-is proposed: vibration margin analysis AN-STR-021 shows no loosening risk
    6. Material Review Board: Signature pending (quality and avionics lead)
    7. Closure: Open

    Condition: MRB signature obtained before the article enters the chamber.

  • SEC-F-031 · Cybersecurity finding · from TRR · blocking from SARCommand authentication replay window

    Penetration test of the TT&C command path found a replay window; fix implemented in FSW 4.2.1, retest pending.

    1. Security requirement: SEC-012 — reject replayed or out-of-sequence telecommands
    2. Threat: Replay of captured telecommands on the S-band uplink
    3. Allocated control: Authenticated commands with a monotonic sequence counter
    4. Configuration: FSW build 4.2.0 · ground command encoder v1.8
    5. Verification method: Penetration test PT-02 on the flat-sat
    6. Finding: SEC-F-031 (medium) — counter accepted within a 30 s window after reset
    7. Remediation: Counter persisted across resets; FSW build 4.2.1
    8. Retest: PT-02 retest on build 4.2.1 · pending
    9. Authorized security review: Not started

    Condition: No uplink commanding outside the test procedure until the retest passes.

  • EVG-SEC-004 · Evidence gap · from TRR · blocking from SARSBOM not regenerated for FSW build 4.2.1

    The software bill of materials on file describes build 4.2.0.

    1. Requirement: SEC-021 — maintain a software bill of materials for every flight build
    2. Evidence on file: SBOM for FSW build 4.2.0
    3. Current configuration: FSW build 4.2.1
    4. Gap: No SBOM or composition analysis for the current build

    Condition: SBOM for build 4.2.1 issued before the build is declared the flight candidate.

  • EVG-THM-002 · Evidence gap · from SAR · blockingThermal model correlation report

    Model correlation against system TVAC results is needed before acceptance.

    1. Requirement: THM-001 — thermal design maintains all units within limits with 5 °C margin
    2. Verification method: Analysis, correlated by test
    3. Prerequisite: System TVAC results (this campaign)
    4. Evidence: Correlation report — not yet produced
  • WVR-007 · Waiver · from SAR · blocking from FRRRadiator coating emissivity below specification

    Measured 0.86 against 0.88 required; accepted at CDR with analysis. Customer acceptance pending.

    1. Requirement: THM-014 — radiator emissivity ≥ 0.88
    2. Inspection: Emissivity measured 0.86 on coating batch B-3
    3. Waiver: WVR-007 · analysis shows margin retained with 0.86
    4. Internal approval: Approved at CDR by the chief engineer
    5. Customer acceptance: Pending
  • EVG-PL-011 · Evidence gap · from SAR · blockingImager MTF evidence from engineering model only

    Modulation transfer function results exist for the engineering model; flight-model data is pending.

    1. Requirement: PL-006 — system MTF ≥ 0.12 at Nyquist
    2. Evidence on file: MTF test on engineering model EM-1
    3. Applicability: Engineering model optics differ from flight model in focal-plane mount
    4. Flight-model test: Planned after TVAC
  • TST-COM-009 · Pending test · from ORR · blockingEnd-to-end RF compatibility with the ground station

    Not yet performed with the operational ground station.

    1. Requirement: COM-002 — TT&C link compatible with the operational ground network
    2. Verification method: Test — end-to-end RF compatibility
    3. Status: Scheduled after shipment to the launch site
  • TST-SEC-012 · Pending test · from ORR · blockingGround segment penetration test

    Mission control and ground station interfaces not yet tested.

    1. Security requirement: SEC-030 — ground segment hardened per the mission security plan
    2. Verification method: Penetration test of mission control and station interfaces
    3. Status: Not yet performed
  • EVG-STR-005 · Evidence gap · from FRR · blockingLaunch adapter fit check

    Mechanical fit check with the launch-vehicle adapter is planned at the launch site.

    1. Requirement: STR-040 — interface to the launch adapter per the launch-vehicle ICD
    2. Verification method: Inspection and fit check
    3. Status: Planned at the launch site
  • EVG-COM-014 · Evidence gap · from MRR · blockingFrequency authorisation evidence not linked

    Spectrum and operating authorisation records are not yet linked to the mission readiness package.

    1. Requirement: MIS-009 — operate only under valid frequency and operating authorisations
    2. Evidence: Authorisation records held by the programme office, not yet linked

Evidence validity scenario (SAT-EPS-014)

  1. 1. Current — TR-EPS-114 passes at 4.102 V per cell. The evidence and the baseline under review are the same configuration.
  2. 2. Change detected — The battery management firmware moves to 2.4.0, the board to Rev C, the EPS–OBC interface to Rev D, the test procedure to Rev B, and the requirement tolerance is tightened in Rev 3.
  3. 3. At Risk — The June evidence was produced on a configuration that no longer matches the baseline. AEAIP flags it; it does not delete or silently keep it.
  4. 4. Reverification Required — Delta analysis shows the charge-termination logic changed in firmware 2.4.0, so the result cannot be retained by rationale. The requirement is reopened and a retest is planned.
  5. 5. Current — reverified — TP-EPS-022 Rev B passes at 4.098 V per cell on BMS FW 2.4.0 and PCB Rev C. The June evidence is marked superseded and kept for history.

Sample data last reviewed . Fictitious; any resemblance to a real programme, requirement or serial number is coincidental.

Would this answer your next readiness review?

Tell us what your review board needs to see. AEAIP is being researched with engineering teams.